Week 5
14/03/2014
Everything is ready to get the roof tiles on, there are more than a few pallets of it. Don't think the house is THAT big! Water pipes have also been installed however we are missing a drain pipe in the kitchen. We will have to chase that up with the SS.
No comments:
Post a Comment